ITAC Assessment: MA0106
ITAC logo
ITAC Assessment: MA0106
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product UTENSIL & HOLLOWWARE
NAICS
n/a
SIC 3914: Silverware, Plated Ware, and Stainless Steel Ware
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,205
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,743 827,374
kWh
Natural Gas $3,024 401
MMBtu
Fuel Oil #6 $28,838 10,407
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,035 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,968

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $334 $129 $334
4,689
kWh
- -
02 2.2491: Use cooling air which cools hot work pieces for space heating $429 $1,250 $(-86.0)
(-1,172)
kWh
$515
-
MMBtu
-
03 2.2113: Repair or replace steam traps $1,717 $3,445 - $2,226
-
MMBtu
$(-509.0)
04 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $2,134 $5,370 - $2,134
-
MMBtu
-
05 2.2511: Insulate bare equipment $504 $1,497 - $504
-
MMBtu
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $917 - $917
12,603
kWh
- -
TOTAL RECOMMENDED $6,035 $11,691 $1,165
16,120
kWh
$5,379
-
MMBtu
$(-509.0)
TOTAL IMPLEMENTED $2,968 $3,574 $1,251
17,292
kWh
$2,226
-
MMBtu
$(-509.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs