| Assessment Year | 1987 |
|---|---|
| Principal Product | UTENSIL & HOLLOWWARE |
| NAICS |
n/a
|
| SIC | 3914: Silverware, Plated Ware, and Stainless Steel Ware |
| Sales Range | $10 M to 50M |
| # of Employees | 145 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,205
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $60,743 | 827,374 |
kWh
|
$0.073 |
| Natural Gas | $3,024 | 401 |
MMBtu
|
$7.54 |
| Fuel Oil #6 | $28,838 | 10,407 |
MMBtu
|
$2.77 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $6,035 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,968 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $334 | $129 |
$334
4,689
kWh
|
- | - | |
| 02 | 2.2491: Use cooling air which cools hot work pieces for space heating | $429 | $1,250 |
$(-86.0)
(-1,172)
kWh
|
$515
-
MMBtu
|
- | |
| 03 | 2.2113: Repair or replace steam traps | $1,717 | $3,445 | - |
$2,226
-
MMBtu
|
$(-509.0) | |
| 04 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $2,134 | $5,370 | - |
$2,134
-
MMBtu
|
- | |
| 05 | 2.2511: Insulate bare equipment | $504 | $1,497 | - |
$504
-
MMBtu
|
- | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $917 | - |
$917
12,603
kWh
|
- | - | |
| TOTAL RECOMMENDED | $6,035 | $11,691 |
$1,165
16,120
kWh
|
$5,379
-
MMBtu
|
$(-509.0) | ||
| TOTAL IMPLEMENTED | $2,968 | $3,574 |
$1,251
17,292
kWh
|
$2,226
-
MMBtu
|
$(-509.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #6 Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs