ITAC Assessment: UK1607
ITAC logo
ITAC Assessment: UK1607
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 8
Plant Area 120,000
ft2
Annual Production 693,500
units
Production Hrs. Annual 8,760
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $177,417 2,667,100
kWh
Electricity Demand $51,645 4,165
kW-mo/yr
Electricity Fees $1,735 -
TOTAL YEARLY COSTS $230,797
RECOMMENDED SAVINGS* $116,203 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,816

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $53,387 $292,000 $42,525
639,480
kWh
$10,862
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $42,600 $41,160 $42,600
640,000
kWh
-
03 2.4321: Upgrade obsolete equipment $19,747 $4,240 $15,729
236,520
kWh
$4,018
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $469 $1,775 $258
3,875
kWh
$211
-
kW-mo/yr
TOTAL RECOMMENDED $116,203 $339,175 $101,112
1,519,875
kWh
$15,091
-
kW-mo/yr
TOTAL IMPLEMENTED $62,816 $47,175 $58,587
880,395
kWh
$4,229
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs