ITAC Assessment: UK1606
ITAC logo
ITAC Assessment: UK1606
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Waste Water Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 5
Plant Area 87,120
ft2
Annual Production 365,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,249 1,009,750
kWh
Electricity Demand $22,973 2,367
kW-mo/yr
Electricity Fees $634 -
TOTAL YEARLY COSTS $91,856
RECOMMENDED SAVINGS* $38,652 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $19,749 $90,000 $10,659
157,680
kWh
$2,808
-
kW-mo/yr
$6,282
-
lb
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,258 $7,310 $2,868
42,423
kWh
$390
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,300 $8,440 $9,300
138,000
kWh
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $316 - $316
4,672
kWh
- - -
05 2.7111: Reduce illumination to minimum necessary levels $5,013 - $4,104
60,704
kWh
- - $909
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,016 $2,500 $610
9,017
kWh
$406
-
kW-mo/yr
- -
TOTAL RECOMMENDED $38,652 $108,250 $27,857
412,496
kWh
$3,604
-
kW-mo/yr
$6,282
-
lb
$909
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs