ITAC Assessment: UK1310
ITAC logo
ITAC Assessment: UK1310
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Dental Equipment and supplies
NAICS 339114: Dental Equipment and Supplies Manufacturing
SIC 3843: Dental Equipment and Supplies
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 17,000
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $171,845 1,915,984
kWh
Electricity Fees $13,414 -
Natural Gas $19,589 3,276
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,787 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,224

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,458 $1,500 $6,458
72,000
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,611 $11,808 $3,611
40,252
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $418 $870 $418
4,662
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $348 $60 $348
3,879
kWh
-
05 3.4151: Minimize water usage $5,952 $14,400 - $5,952
-
Tgal
TOTAL RECOMMENDED $16,787 $28,638 $10,835
120,793
kWh
$5,952
-
Tgal
TOTAL IMPLEMENTED $7,224 $2,430 $7,224
80,541
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs