*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Sheet Metal Products
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 47
Plant Area 60,000
ft2
Annual Production 67,439
units
Production Hrs. Annual 5,226
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,399 1,078,320
kWh
Electricity Demand $44,791 3,475
kW-mo/yr
Electricity Fees $3,736 -
TOTAL YEARLY COSTS $116,926
RECOMMENDED SAVINGS* $208,898 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $51,273 $322,608 $38,900
617,460
kWh
$12,373
-
kW-mo/yr
- -
02 2.7243: Improve air circulation with destratification fans / other methods $33,462 $12,390 $(-575.0)
(-9,128)
kWh
$(-543.0)
-
kW-mo/yr
- $34,580
03 2.3191: Use demand controller or load shedder $7,895 $5,801 $4,755
75,482
kWh
$3,140
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,440 $6,188 $1,355
21,505
kWh
$1,085
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,082 $469 $2,082
33,047
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,573 $3,962 $1,573
24,973
kWh
- - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $710 - $613
9,724
kWh
- $43 $54
08 4.463: Modify facility to avoid excess maintenance costs $68,287 $300,000 - - - $68,287
09 4.424: Improve space comfort conditioning $31,920 $804 - - - $31,920
10 4.424: Improve space comfort conditioning $9,256 $2,512 $(-575.0)
(-9,126)
kWh
$(-543.0)
-
kW-mo/yr
- $10,374
TOTAL RECOMMENDED $208,898 $654,734 $48,128
763,937
kWh
$15,512
-
kW-mo/yr
$43 $145,215
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs