ITAC Assessment: UF0607
ITAC logo
ITAC Assessment: UF0607
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $5
M
to 10
M
# of Employees 150
Plant Area 3,000,000
ft2
Annual Production 2,737,500
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,832,935 22,098,600
kWh
Electricity Demand $641,506 60,178
kW-mo/yr
Electricity Fees $66,587 -
TOTAL YEARLY COSTS $2,541,028
RECOMMENDED SAVINGS* $613,766 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $394,141

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3191: Use demand controller or load shedder $173,293 $118,890 $128,393
1,546,902
kWh
$44,900
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $122,669 $11,700 $75,744
912,584
kWh
$46,925
-
kW-mo/yr
- -
03 2.9114: Use solar heat to make electricty $94,496 $322,608 $53,562
645,324
kWh
$40,934
-
kW-mo/yr
- -
04 2.6231: Utilize controls to operate equipment only when needed $36,207 $25,350 $36,207
436,228
kWh
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,683 - $3,609
43,485
kWh
- $38 $36
06 4.661: Level zero – install control systems for existing equipment $183,418 $60,000 $183,418
2,209,860
kWh
- - -
TOTAL RECOMMENDED $613,766 $538,548 $480,933
5,794,383
kWh
$132,759
-
kW-mo/yr
$38 $36
TOTAL IMPLEMENTED $394,141 $453,198 $261,308
3,148,295
kWh
$132,759
-
kW-mo/yr
$38 $36
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs