Assessment Year | 2024 |
---|---|
Principal Product | Treated Wastewater |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $5 M to 10M |
# of Employees | 150 |
Plant Area |
3,000,000
ft2
|
Annual Production | 2,737,500
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,832,935 | 22,098,600 |
kWh
|
$0.083 |
Electricity Demand | $641,506 | 60,178 |
kW-mo/yr
|
$10.66 |
Electricity Fees | $66,587 | - |
|
- |
TOTAL YEARLY COSTS | $2,541,028 | |||
RECOMMENDED SAVINGS* | $613,766 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $394,141 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $173,293 | $118,890 |
$128,393
1,546,902
kWh
|
$44,900
-
kW-mo/yr
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $122,669 | $11,700 |
$75,744
912,584
kWh
|
$46,925
-
kW-mo/yr
|
- | - | |
03 | 2.9114: Use solar heat to make electricty | $94,496 | $322,608 |
$53,562
645,324
kWh
|
$40,934
-
kW-mo/yr
|
- | - | |
04 | 2.6231: Utilize controls to operate equipment only when needed | $36,207 | $25,350 |
$36,207
436,228
kWh
|
- | - | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,683 | - |
$3,609
43,485
kWh
|
- | $38 | $36 | |
06 | 4.661: Level zero – install control systems for existing equipment | $183,418 | $60,000 |
$183,418
2,209,860
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $613,766 | $538,548 |
$480,933
5,794,383
kWh
|
$132,759
-
kW-mo/yr
|
$38 | $36 | ||
TOTAL IMPLEMENTED | $394,141 | $453,198 |
$261,308
3,148,295
kWh
|
$132,759
-
kW-mo/yr
|
$38 | $36 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs