Assessment Year | 2024 |
---|---|
Principal Product | Asphalt Cement |
NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
SIC | 2951: Asphalt Paving Mixtures and Blocks |
Sales Range | $50 M to 100M |
# of Employees | 9 |
Plant Area |
813,544
ft2
|
Annual Production | 90,000
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $101,613 | 1,153,600 |
kWh
|
$0.088 |
Electricity Demand | $62,661 | 4,466 |
kW-mo/yr
|
$14.03 |
Electricity Fees | $35,421 | - |
|
- |
Natural Gas | $86,953 | 15,370 |
MMBtu
|
$5.66 |
TOTAL YEARLY COSTS | $286,648 | |||
RECOMMENDED SAVINGS* | $1,613,601 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,505,179 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $108,422 | $322,608 |
$54,543
619,806
kWh
|
$53,879
-
kW-mo/yr
|
- | - | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $38,052 | $10,000 | - | - |
$38,052
-
MMBtu
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $13,825 | $11,200 |
$8,213
93,331
kWh
|
$5,612
-
kW-mo/yr
|
- | - | |
04 | 2.1116: Improve combustion control capability | $3,043 | $2,800 | - | - |
$3,043
-
MMBtu
|
- | |
05 | 4.662: Level one – add communication using iiot devices to existing control system to modify operations | $1,444,605 | - | - | - | - | $1,444,605 | |
06 | 4.661: Level zero – install control systems for existing equipment | $5,654 | $20,000 |
$3,046
34,608
kWh
|
- |
$2,608
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $1,613,601 | $366,608 |
$65,802
747,745
kWh
|
$59,491
-
kW-mo/yr
|
$43,703
-
MMBtu
|
$1,444,605 | ||
TOTAL IMPLEMENTED | $1,505,179 | $44,000 |
$11,259
127,939
kWh
|
$5,612
-
kW-mo/yr
|
$43,703
-
MMBtu
|
$1,444,605 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs