ITAC Assessment: UF0605
ITAC logo
ITAC Assessment: UF0605
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Asphalt Cement
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $50
M
to 100
M
# of Employees 9
Plant Area 813,544
ft2
Annual Production 90,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,613 1,153,600
kWh
Electricity Demand $62,661 4,466
kW-mo/yr
Electricity Fees $35,421 -
Natural Gas $86,953 15,370
MMBtu
TOTAL YEARLY COSTS $286,648
RECOMMENDED SAVINGS* $1,613,601 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,505,179

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $108,422 $322,608 $54,543
619,806
kWh
$53,879
-
kW-mo/yr
- -
02 2.2414: Use waste heat from hot flue gases to preheat $38,052 $10,000 - - $38,052
-
MMBtu
-
03 2.4133: Use most efficient type of electric motors $13,825 $11,200 $8,213
93,331
kWh
$5,612
-
kW-mo/yr
- -
04 2.1116: Improve combustion control capability $3,043 $2,800 - - $3,043
-
MMBtu
-
05 4.662: Level one – add communication using iiot devices to existing control system to modify operations $1,444,605 - - - - $1,444,605
06 4.661: Level zero – install control systems for existing equipment $5,654 $20,000 $3,046
34,608
kWh
- $2,608
-
MMBtu
-
TOTAL RECOMMENDED $1,613,601 $366,608 $65,802
747,745
kWh
$59,491
-
kW-mo/yr
$43,703
-
MMBtu
$1,444,605
TOTAL IMPLEMENTED $1,505,179 $44,000 $11,259
127,939
kWh
$5,612
-
kW-mo/yr
$43,703
-
MMBtu
$1,444,605
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs