ITAC Assessment: CO0127
ITAC logo
ITAC Assessment: CO0127
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product LAMB CARCASSES
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area
n/a
Annual Production 750,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,574 2,143,611
kWh
Natural Gas $98,569 27,064
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,730 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,894

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8113: Purchase gas directly from a contract gas supplier $14,785 $2,000 - $14,785
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,065 $7,500 - $1,065
-
MMBtu
03 2.1213: Direct warmest air to combustion intake $948 $1,000 - $948
-
MMBtu
04 2.7444: Close holes and openings in building such as broken windows $1,514 $500 $793
16,413
kWh
$721
-
MMBtu
05 2.7447: Install vinyl strip / high speed / air curtain doors $2,211 $5,000 $1,127
23,447
kWh
$1,084
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,707 $3,035 $2,707
55,979
kWh
-
07 2.2121: Increase amount of condensate returned $911 $1,000 - $911
-
MMBtu
08 2.2414: Use waste heat from hot flue gases to preheat $3,677 $10,000 - $3,677
-
MMBtu
09 2.2511: Insulate bare equipment $659 $1,000 - $659
-
MMBtu
10 2.7142: Utilize higher efficiency lamps and/or ballasts $253 $271 $253
5,275
kWh
-
TOTAL RECOMMENDED $28,730 $31,306 $4,880
101,114
kWh
$23,850
-
MMBtu
TOTAL IMPLEMENTED $21,894 $15,306 $3,753
77,667
kWh
$18,141
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs