| Assessment Year | 2023 |
|---|---|
| Principal Product | Treated Wastewater |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $1 M to 5M |
| # of Employees | 10 |
| Plant Area |
540,000
ft2
|
| Annual Production | 2,226,500
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $633,216 | 7,141,473 |
kWh
|
$0.089 |
| Electricity Demand | $1 | 13,433 |
kW-mo/yr
|
$0.000 |
| Electricity Fees | $56,064 | - |
|
- |
| TOTAL YEARLY COSTS | $689,281 | |||
| RECOMMENDED SAVINGS* | $168,933 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $119,288 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $48,311 | $293,280 |
$48,311
542,823
kWh
|
- | |
| 02 | 2.4133: Use most efficient type of electric motors | $30,577 | $37,582 |
$30,577
343,560
kWh
|
- | |
| 03 | 2.4112: Install soft-start to eliminate nuisance trips | $8,590 | $37,275 |
$8,590
96,514
kWh
|
- | |
| 04 | 2.7243: Improve air circulation with destratification fans / other methods | $3,173 | - |
$3,173
35,650
kWh
|
- | |
| 05 | 2.7132: Install timers on light switches in little used areas | $2,430 | $780 |
$2,430
27,300
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,334 | $6,383 |
$1,334
14,990
kWh
|
- | |
| 07 | 4.661: Level zero – install control systems for existing equipment | $63,559 | $10,000 |
$63,559
714,147
kWh
|
- | |
| 08 | 4.662: Level one – add communication using iiot devices to existing control system to modify operations | $10,959 | - | - | $10,959 | |
| TOTAL RECOMMENDED | $168,933 | $385,300 |
$157,974
1,774,984
kWh
|
$10,959 | ||
| TOTAL IMPLEMENTED | $119,288 | $85,637 |
$108,329
1,217,171
kWh
|
$10,959 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs