Assessment Year | 2023 |
---|---|
Principal Product | Bread |
NAICS | 311812: Commercial Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $100 M to 500M |
# of Employees | 35 |
Plant Area |
105,895
ft2
|
Annual Production | 59,342
ton
|
Production Hrs. Annual | 6,460
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $480,606 | 8,296,400 |
kWh
|
$0.058 | |
Electricity Demand | $206,348 | 14,454 |
kW-mo/yr
|
$14.28 | |
Electricity Fees | $19,148 | - |
|
- | |
Natural Gas | $72,270 | 37,757 |
MMBtu
|
$1.91 | |
Waste Disposal Costs | |||||
Water Usage | $18,974 | 60 |
Tgal
|
$313.78 | |
Water Disposal | $8,692 | 17 |
Tgal
|
$519.86 | |
TOTAL YEARLY COSTS | $806,038 | ||||
RECOMMENDED SAVINGS* | $601,872 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $139,856 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $460,292 | $1,330,000 |
$406,000
7,000,000
kWh
|
$171,312
-
kW-mo/yr
|
$(-88,816.0)
-
MMBtu
|
- | $(-28,204.0) | - | |
02 | 2.3191: Use demand controller or load shedder | $48,128 | $44,635 |
$33,683
580,748
kWh
|
$14,445
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $45,481 | $66,747 |
$45,481
784,159
kWh
|
- | - | - | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $27,896 | $8,591 |
$17,941
309,321
kWh
|
$9,955
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.2623: Minimize condenser cooling water temperature | $12,470 | $19,320 |
$12,470
215,000
kWh
|
- | - | - | - | - | |
06 | 2.8117: Install sub-metering equipment | $2,168 | $8,880 | - | - |
$2,168
-
MMBtu
|
- | - | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,713 | - |
$3,245
55,947
kWh
|
- | - | $220 | - | $248 | |
08 | 2.1222: Install turbulators | $1,724 | $7,500 | - | - |
$1,724
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $601,872 | $1,485,673 |
$518,820
8,945,175
kWh
|
$195,712
-
kW-mo/yr
|
$(-84,924.0)
-
MMBtu
|
$220 | $(-28,204.0) | $248 | ||
TOTAL IMPLEMENTED | $139,856 | $148,173 |
$112,820
1,945,175
kWh
|
$24,400
-
kW-mo/yr
|
$2,168
-
MMBtu
|
$220 | - | $248 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs