ITAC Assessment: UF0591
ITAC logo
ITAC Assessment: UF0591
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Bread
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 35
Plant Area 105,895
ft2
Annual Production 59,342
ton
Production Hrs. Annual 6,460
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $480,606 8,296,400
kWh
Electricity Demand $206,348 14,454
kW-mo/yr
Electricity Fees $19,148 -
Natural Gas $72,270 37,757
MMBtu
Waste Disposal Costs
Water Usage $18,974 60
Tgal
Water Disposal $8,692 17
Tgal
TOTAL YEARLY COSTS $806,038
RECOMMENDED SAVINGS* $601,872 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $139,856

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $460,292 $1,330,000 $406,000
7,000,000
kWh
$171,312
-
kW-mo/yr
$(-88,816.0)
-
MMBtu
- $(-28,204.0) -
02 2.3191: Use demand controller or load shedder $48,128 $44,635 $33,683
580,748
kWh
$14,445
-
kW-mo/yr
- - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $45,481 $66,747 $45,481
784,159
kWh
- - - - -
04 2.4133: Use most efficient type of electric motors $27,896 $8,591 $17,941
309,321
kWh
$9,955
-
kW-mo/yr
- - - -
05 2.2623: Minimize condenser cooling water temperature $12,470 $19,320 $12,470
215,000
kWh
- - - - -
06 2.8117: Install sub-metering equipment $2,168 $8,880 - - $2,168
-
MMBtu
- - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,713 - $3,245
55,947
kWh
- - $220 - $248
08 2.1222: Install turbulators $1,724 $7,500 - - $1,724
-
MMBtu
- - -
TOTAL RECOMMENDED $601,872 $1,485,673 $518,820
8,945,175
kWh
$195,712
-
kW-mo/yr
$(-84,924.0)
-
MMBtu
$220 $(-28,204.0) $248
TOTAL IMPLEMENTED $139,856 $148,173 $112,820
1,945,175
kWh
$24,400
-
kW-mo/yr
$2,168
-
MMBtu
$220 - $248
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs