Assessment Year | 2022 |
---|---|
Principal Product | Treated Wastewater |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $500 k to 1M |
# of Employees | 7 |
Plant Area |
131,250
ft2
|
Annual Production | 663,330
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $114,916 | 1,077,240 |
kWh
|
$0.11 |
Natural Gas | $11,368 | 21,785 |
MMBtu
|
$0.52 |
TOTAL YEARLY COSTS | $126,284 | |||
RECOMMENDED SAVINGS* | $128,545 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $47,396 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $74,168 | $293,280 |
$74,168
693,160
kWh
|
- | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $17,084 | $4,202 |
$17,084
159,669
kWh
|
- | - | - | |
03 | 2.3191: Use demand controller or load shedder | $8,046 | $5,794 |
$8,046
75,407
kWh
|
- | - | - | |
04 | 2.4112: Install soft-start to eliminate nuisance trips | $5,091 | $8,250 |
$5,091
47,578
kWh
|
- | - | - | |
05 | 4.661: Level zero – install control systems for existing equipment | $11,526 | $10,000 |
$11,526
107,724
kWh
|
- | - | - | |
06 | 4.664: Level three - install or modify control system with communication and nonlocal external information (i.e. weather foreca | $3,458 | $11,225 |
$3,458
32,317
kWh
|
- | - | - | |
07 | 4.662: Level one – add communication using iiot devices to existing control system to modify operations | $2,191 | - | - | - | $2,191 | - | |
08 | 3.5217: Reuse / recycle/ sell paper products | $6,981 | $27,240 |
$(-9,461.0)
(-88,425)
kWh
|
$(-115.0)
-
MMBtu
|
- | $16,557 | |
TOTAL RECOMMENDED | $128,545 | $359,991 |
$109,912
1,027,430
kWh
|
$(-115.0)
-
MMBtu
|
$2,191 | $16,557 | ||
TOTAL IMPLEMENTED | $47,396 | $39,471 |
$45,205
422,695
kWh
|
- | $2,191 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs