ITAC Assessment: UF0571
ITAC logo
ITAC Assessment: UF0571
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 1,314,968
ft2
Annual Production 2,829,428
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $654,101 15,542,090
kWh
Electricity Demand $380,874 27,245
kW-mo/yr
Electricity Fees $30,120 -
TOTAL YEARLY COSTS $1,065,095
RECOMMENDED SAVINGS* $197,120 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $197,120

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings
01 2.3191: Use demand controller or load shedder $72,351 $83,616 $45,694
1,087,946
kWh
$26,657
-
kW-mo/yr
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $23,651 $18,000 $23,651
563,119
kWh
- -
03 2.4112: Install soft-start to eliminate nuisance trips $22,414 $51,208 $22,414
533,667
kWh
- -
04 2.7135: Install occupancy sensors $4,673 $5,569 $4,673
111,265
kWh
- -
05 4.661: Level zero – install control systems for existing equipment $65,277 $10,000 $65,277
1,554,209
kWh
- -
06 4.662: Level one – add communication using iiot devices to existing control system to modify operations $8,754 - - - $8,754
TOTAL RECOMMENDED $197,120 $168,393 $161,709
3,850,206
kWh
$26,657
-
kW-mo/yr
$8,754
TOTAL IMPLEMENTED $197,120 $168,393 $161,709
3,850,206
kWh
$26,657
-
kW-mo/yr
$8,754
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs