| Assessment Year | 2021 |
|---|---|
| Principal Product | Treated Wastewater |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $10 M to 50M |
| # of Employees | 15 |
| Plant Area |
3,397,680
ft2
|
| Annual Production | 3,428,381
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $633,908 | 10,744,200 |
kWh
|
$0.059 |
| Electricity Demand | $148,932 | 24,822 |
kW-mo/yr
|
$6.00 |
| Electricity Fees | $5,963 | - |
|
- |
| TOTAL YEARLY COSTS | $788,803 | |||
| RECOMMENDED SAVINGS* | $3,007,076 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $277,754 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Product Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4323: Use optimum size and capacity equipment | $123,727 | $246,613 |
$95,295
1,615,170
kWh
|
$28,432
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $95,985 | $228,343 |
$95,985
1,626,870
kWh
|
- | - | - | - | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $42,803 | $42,764 |
$34,964
592,608
kWh
|
$7,839
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 2.4112: Install soft-start to eliminate nuisance trips | $9,372 | $14,250 |
$9,372
158,847
kWh
|
- | - | - | - | - | |
| 05 | 2.5121: Redesign flow to minimize mass transfer length | $1,402 | - |
$1,402
23,765
kWh
|
- | - | - | - | - | |
| 06 | 3.5217: Reuse / recycle/ sell paper products | $2,719,160 | $106,000 |
$(-37,523.0)
(-635,976)
kWh
|
$(-5,227.0)
-
kW-mo/yr
|
$(-131,306.0)
-
MMBtu
|
- | - | $2,893,216 | |
| 07 | 3.6192: Use a less expensive method of waste removal | $8,760 | $8,000 | - | - | - | $8,760 | - | - | |
| 08 | 4.662: Level one – add communication using iiot devices to existing control system to modify operations | $5,867 | - | - | - | - | - | $5,867 | - | |
| TOTAL RECOMMENDED | $3,007,076 | $645,970 |
$199,495
3,381,284
kWh
|
$31,044
-
kW-mo/yr
|
$(-131,306.0)
-
MMBtu
|
$8,760 | $5,867 | $2,893,216 | ||
| TOTAL IMPLEMENTED | $277,754 | $531,970 |
$235,616
3,993,495
kWh
|
$36,271
-
kW-mo/yr
|
- | - | $5,867 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Product Savings | By-product Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs