ITAC Assessment: UF0567
ITAC logo
ITAC Assessment: UF0567
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 15
Plant Area 3,397,680
ft2
Annual Production 3,428,381
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $633,908 10,744,200
kWh
Electricity Demand $148,932 24,822
kW-mo/yr
Electricity Fees $5,963 -
TOTAL YEARLY COSTS $788,803
RECOMMENDED SAVINGS* $3,007,076 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $277,754

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings By-product Production Savings
01 2.4323: Use optimum size and capacity equipment $123,727 $246,613 $95,295
1,615,170
kWh
$28,432
-
kW-mo/yr
- - - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $95,985 $228,343 $95,985
1,626,870
kWh
- - - - -
03 2.4133: Use most efficient type of electric motors $42,803 $42,764 $34,964
592,608
kWh
$7,839
-
kW-mo/yr
- - - -
04 2.4112: Install soft-start to eliminate nuisance trips $9,372 $14,250 $9,372
158,847
kWh
- - - - -
05 2.5121: Redesign flow to minimize mass transfer length $1,402 - $1,402
23,765
kWh
- - - - -
06 3.5217: Reuse / recycle/ sell paper products $2,719,160 $106,000 $(-37,523.0)
(-635,976)
kWh
$(-5,227.0)
-
kW-mo/yr
$(-131,306.0)
-
MMBtu
- - $2,893,216
07 3.6192: Use a less expensive method of waste removal $8,760 $8,000 - - - $8,760 - -
08 4.662: Level one – add communication using iiot devices to existing control system to modify operations $5,867 - - - - - $5,867 -
TOTAL RECOMMENDED $3,007,076 $645,970 $199,495
3,381,284
kWh
$31,044
-
kW-mo/yr
$(-131,306.0)
-
MMBtu
$8,760 $5,867 $2,893,216
TOTAL IMPLEMENTED $277,754 $531,970 $235,616
3,993,495
kWh
$36,271
-
kW-mo/yr
- - $5,867 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings By-product Production Savings