ITAC Assessment: UF0556
ITAC logo
ITAC Assessment: UF0556
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Malt Beverges
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 40,000
ft2
Annual Production 4,332
bbl
Production Hrs. Annual 4,015
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,328 305,920
kWh
Electricity Demand $9,367 986
kW-mo/yr
Natural Gas $56,336 5,251
MMBtu
Waste Disposal Costs
Water Usage $8,778 832
Tgal
TOTAL YEARLY COSTS $113,809
RECOMMENDED SAVINGS* $43,783 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,513

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $33,420 $174,290 $33,420
259,073
kWh
-
02 2.7232: Replace existing hvac unit with high efficiency model $4,365 $10,575 $3,241
25,123
kWh
$1,124
-
kW-mo/yr
03 2.7145: Install skylights $2,253 $4,190 $2,253
17,467
kWh
-
04 2.7135: Install occupancy sensors $1,675 $2,955 $1,675
12,988
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,165 $421 $1,165
9,031
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $905 $3,206 $905
7,013
kWh
-
TOTAL RECOMMENDED $43,783 $195,637 $42,659
330,695
kWh
$1,124
-
kW-mo/yr
TOTAL IMPLEMENTED $38,513 $181,856 $38,513
298,559
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs