ITAC Assessment: UF0552
ITAC logo
ITAC Assessment: UF0552
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 15
Plant Area 400,000
ft2
Annual Production 6,236,900
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $334,789 8,066,918
kWh
TOTAL YEARLY COSTS $334,789
RECOMMENDED SAVINGS* $112,443 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $112,443

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Ancillary Material Cost Savings Primary Product Savings
01 4.662: Level one – add communication using iiot devices to existing control system to modify operations $23,402 - - - $23,402
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,039 $76,500 $21,039
506,961
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $16,179 $10,903 $16,179
389,852
kWh
- -
04 2.4112: Install soft-start to eliminate nuisance trips $3,882 $5,338 $3,882
93,535
kWh
- -
05 2.7135: Install occupancy sensors $2,364 $6,394 $2,364
56,974
kWh
- -
06 4.631: Install an uninteruptable power supply $45,577 $65,793 $(-125.0)
(-3,000)
kWh
$45,702 -
TOTAL RECOMMENDED $112,443 $164,928 $43,339
1,044,322
kWh
$45,702 $23,402
TOTAL IMPLEMENTED $112,443 $164,928 $43,339
1,044,322
kWh
$45,702 $23,402
Yearly Savings* Imp'd Cost* Electricity Usage Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs