| Assessment Year | 2020 |
|---|---|
| Principal Product | Wastewater Treatment |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $10 M to 50M |
| # of Employees | 15 |
| Plant Area |
400,000
ft2
|
| Annual Production | 6,236,900
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $334,789 | 8,066,918 |
kWh
|
$0.042 |
| TOTAL YEARLY COSTS | $334,789 | |||
| RECOMMENDED SAVINGS* | $112,443 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $112,443 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Ancillary Material Cost Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|
| 01 | 4.662: Level one – add communication using iiot devices to existing control system to modify operations | $23,402 | - | - | - | $23,402 | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $21,039 | $76,500 |
$21,039
506,961
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,179 | $10,903 |
$16,179
389,852
kWh
|
- | - | |
| 04 | 2.4112: Install soft-start to eliminate nuisance trips | $3,882 | $5,338 |
$3,882
93,535
kWh
|
- | - | |
| 05 | 2.7135: Install occupancy sensors | $2,364 | $6,394 |
$2,364
56,974
kWh
|
- | - | |
| 06 | 4.631: Install an uninteruptable power supply | $45,577 | $65,793 |
$(-125.0)
(-3,000)
kWh
|
$45,702 | - | |
| TOTAL RECOMMENDED | $112,443 | $164,928 |
$43,339
1,044,322
kWh
|
$45,702 | $23,402 | ||
| TOTAL IMPLEMENTED | $112,443 | $164,928 |
$43,339
1,044,322
kWh
|
$45,702 | $23,402 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Ancillary Material Cost Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs