Assessment Year | 2017 |
---|---|
Principal Product | Electroplating |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $1 M to 5M |
# of Employees | 65 |
Plant Area |
69,000
ft2
|
Annual Production | 5,000,000
pieces
|
Production Hrs. Annual | 2,730
hrs
|
Location (State) | Puerto Rico |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $216,905 | 1,201,360 |
kWh
|
$0.18 |
Electricity Demand | $55,368 | 6,836 |
kW-mo/yr
|
$8.10 |
Electricity Fees | $3,262 | - |
|
- |
Fuel Oil #2 | $120,483 | 8,016 |
MMBtu
|
$15.03 |
TOTAL YEARLY COSTS | $396,017 | |||
RECOMMENDED SAVINGS* | $62,331 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,716 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $27,225 | $14,854 |
$22,750
125,689
kWh
|
$4,475
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,604 | $1,660 |
$8,786
48,544
kWh
|
$818
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,332 | $4,841 |
$6,127
33,852
kWh
|
$1,205
-
kW-mo/yr
|
- | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $7,058 | $9,700 | - | - |
$7,058
-
MMBtu
|
|
05 | 2.2628: Utilize a less expensive cooling method | $3,801 | $160 |
$3,177
17,554
kWh
|
$624
-
kW-mo/yr
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,645 | $2,520 | - | - |
$2,645
-
MMBtu
|
|
07 | 2.4322: Use or replace with energy efficient substitutes | $2,220 | $1,600 |
$1,855
10,248
kWh
|
$365
-
kW-mo/yr
|
- | |
08 | 2.2515: Use optimum thickness insulation | $1,467 | $388 | - | - |
$1,467
-
MMBtu
|
|
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $979 | $3,042 |
$817
4,515
kWh
|
$162
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $62,331 | $38,765 |
$43,512
240,402
kWh
|
$7,649
-
kW-mo/yr
|
$11,170
-
MMBtu
|
||
TOTAL IMPLEMENTED | $20,716 | $9,370 |
$14,635
80,861
kWh
|
$1,969
-
kW-mo/yr
|
$4,112
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs