ITAC Assessment: UF0542
ITAC logo
ITAC Assessment: UF0542
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Reclaimed Water and Bio-Solids
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 24
Plant Area 2,265,633
ft2
Annual Production 2,400,000
Tgal
Production Hrs. Annual 6,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $380,779 6,848,676
kWh
Electricity Demand $189,215 34,377
kW-mo/yr
Electricity Fees $30,164 -
TOTAL YEARLY COSTS $600,158
RECOMMENDED SAVINGS* $95,443 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $95,443

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4311: Recover mechanical energy $21,606 $120,000 $31,870
569,107
kWh
$(-264.2)
-
kW-mo/yr
$(-10,000.0)
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $33,764 $60,608 $33,764
602,930
kWh
- -
03 2.4133: Use most efficient type of electric motors $40,073 $72,054 $34,532
616,651
kWh
$5,541
-
kW-mo/yr
-
TOTAL RECOMMENDED $95,443 $252,662 $100,166
1,788,688
kWh
$5,277
-
kW-mo/yr
$(-10,000.0)
TOTAL IMPLEMENTED $95,443 $252,662 $100,166
1,788,688
kWh
$5,277
-
kW-mo/yr
$(-10,000.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs