ITAC Assessment: UF0538
ITAC logo
ITAC Assessment: UF0538
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Panel Doors
NAICS 337110: Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434: Wood Kitchen Cabinets
Sales Range $5
M
to 10
M
# of Employees 25
Plant Area 318,257
ft2
Annual Production 75,000
units
Production Hrs. Annual 2,340
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,920 1,423,533
kWh
Electricity Demand $73,701 6,252
kW-mo/yr
Electricity Fees $27,365 -
LPG $4,304 105
MMBtu
TOTAL YEARLY COSTS $176,290
RECOMMENDED SAVINGS* $50,724 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,724

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $25,744 $52,547 $10,907
218,130
kWh
$14,837
-
kW-mo/yr
-
02 2.7145: Install skylights $11,989 $45,500 $11,989
239,782
kWh
- -
03 2.7141: Lower light fixtures in high ceiling areas $11,027 $7,692 $4,672
93,434
kWh
$6,355
-
kW-mo/yr
-
04 2.7243: Improve air circulation with destratification fans / other methods $1,964 $6,180 $(-183.0)
(-3,661)
kWh
$(-249.0)
-
kW-mo/yr
$2,396
TOTAL RECOMMENDED $50,724 $111,919 $27,385
547,685
kWh
$20,943
-
kW-mo/yr
$2,396
TOTAL IMPLEMENTED $50,724 $111,919 $27,385
547,685
kWh
$20,943
-
kW-mo/yr
$2,396
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs