ITAC Assessment: UF0537
ITAC logo
ITAC Assessment: UF0537
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Sporting and Athletic Goods
NAICS 339920: Sporting and Athletic Goods Manufacturing
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 180,000
ft2
Annual Production 72,510
units
Production Hrs. Annual 2,184
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $271,095 2,779,400
kWh
Electricity Demand $83,325 8,771
kW-mo/yr
Electricity Fees $61,551 -
Natural Gas $21,153 2,215
MMBtu
TOTAL YEARLY COSTS $437,124
RECOMMENDED SAVINGS* $194,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,165

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings By-product Production Savings
01 2.9114: Use solar heat to make electricty $55,866 $333,760 $55,866
570,064
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $16,122 $61,119 $11,589
118,257
kWh
$4,533
-
kW-mo/yr
- -
03 2.7491: Insulate glazing, walls, ceilings, and roofs $14,734 $25,470 $14,734
150,342
kWh
- - -
04 2.4224: Upgrade controls on compressors $9,846 $1,101 $9,846
100,472
kWh
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,091 $8,377 $6,091
62,151
kWh
- - -
06 2.7496: Install partitions to reduce size of conditioned space $5,428 $500 $5,428
55,384
kWh
- - -
07 2.4222: Install adequate dryers on air lines to eliminate blowdown $4,046 $914 $4,046
41,285
kWh
- - -
08 2.4224: Upgrade controls on compressors $4,046 $6,800 $4,046
41,285
kWh
- - -
09 4.111: Add equipment/ operators to reduce production bottleneck $37,600 $100,000 - - $37,600 -
10 3.5242: Recover metals from spent solutions and recycle $40,781 $21,000 - - - $40,781
TOTAL RECOMMENDED $194,560 $559,041 $111,646
1,139,240
kWh
$4,533
-
kW-mo/yr
$37,600 $40,781
TOTAL IMPLEMENTED $53,165 $109,791 $15,565
158,820
kWh
- $37,600 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs