| Assessment Year | 2018 |
|---|---|
| Principal Product | Surgical and Medical Instruments and Apparatus |
| NAICS | 339112: Surgical and Medical Instrument Manufacturing |
| SIC | 3841: Surgical and Medical Instruments and Apparatus |
| Sales Range | $10 M to 50M |
| # of Employees | 818 |
| Plant Area |
63,210
ft2
|
| Annual Production | 10,000,000
units
|
| Production Hrs. Annual | 6,256
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $391,169 | 5,588,135 |
kWh
|
$0.070 | |
| Electricity Demand | $68,058 | 8,507 |
kW-mo/yr
|
$8.00 | |
| Electricity Fees | $16,848 | - |
|
- | |
| Natural Gas | $17,894 | 7,334 |
MMBtu
|
$2.44 | |
| Waste Disposal Costs | |||||
| Water Usage | $35,053 | 14,980 |
Tgal
|
$2.34 | |
| Water Disposal | $58,768 | 13,482 |
Tgal
|
$4.36 | |
| TOTAL YEARLY COSTS | $587,790 | ||||
| RECOMMENDED SAVINGS* | $427,147 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $52,301 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $120,914 | $400,000 |
$131,376
1,876,800
kWh
|
$28,800
-
kW-mo/yr
|
$(-37,200.0)
-
MMBtu
|
- | $(-2,062.0) | - | |
| 02 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $6,142 | $18,013 |
$6,142
87,740
kWh
|
- | - | - | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,159 | $12,014 |
$3,167
45,246
kWh
|
$992
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 4.448: Install automatic part storage / retreval system | $200,000 | $100,000 | - | - | - | $42,000 | - | $158,000 | |
| 05 | 4.423: Move product using mechanical means | $42,000 | $70,000 | - | - | - | $42,000 | - | - | |
| 06 | 4.445: Install equipment to move product | $30,207 | $5,350 |
$(-97.1)
(-1,387)
kWh
|
$(-182.4)
-
kW-mo/yr
|
- | $8,112 | $22,374 | - | |
| 07 | 2.7243: Improve air circulation with destratification fans / other methods | $23,725 | $10,695 | - | - | - | $23,725 | - | - | |
| TOTAL RECOMMENDED | $427,147 | $616,072 |
$140,588
2,008,399
kWh
|
$29,610
-
kW-mo/yr
|
$(-37,200.0)
-
MMBtu
|
$115,837 | $20,312 | $158,000 | ||
| TOTAL IMPLEMENTED | $52,301 | $100,027 |
$9,309
132,986
kWh
|
$992
-
kW-mo/yr
|
- | $42,000 | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | By-product Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs