ITAC Assessment: UF0516
ITAC logo
ITAC Assessment: UF0516
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Surgical and Medical Instruments and Apparatus
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 818
Plant Area 63,210
ft2
Annual Production 10,000,000
units
Production Hrs. Annual 6,256
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $391,169 5,588,135
kWh
Electricity Demand $68,058 8,507
kW-mo/yr
Electricity Fees $16,848 -
Natural Gas $17,894 7,334
MMBtu
Waste Disposal Costs
Water Usage $35,053 14,980
Tgal
Water Disposal $58,768 13,482
Tgal
TOTAL YEARLY COSTS $587,790
RECOMMENDED SAVINGS* $427,147 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,301

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings By-product Production Savings
01 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $120,914 $400,000 $131,376
1,876,800
kWh
$28,800
-
kW-mo/yr
$(-37,200.0)
-
MMBtu
- $(-2,062.0) -
02 2.7491: Insulate glazing, walls, ceilings, and roofs $6,142 $18,013 $6,142
87,740
kWh
- - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,159 $12,014 $3,167
45,246
kWh
$992
-
kW-mo/yr
- - - -
04 4.448: Install automatic part storage / retreval system $200,000 $100,000 - - - $42,000 - $158,000
05 4.423: Move product using mechanical means $42,000 $70,000 - - - $42,000 - -
06 4.445: Install equipment to move product $30,207 $5,350 $(-97.1)
(-1,387)
kWh
$(-182.4)
-
kW-mo/yr
- $8,112 $22,374 -
07 2.7243: Improve air circulation with destratification fans / other methods $23,725 $10,695 - - - $23,725 - -
TOTAL RECOMMENDED $427,147 $616,072 $140,588
2,008,399
kWh
$29,610
-
kW-mo/yr
$(-37,200.0)
-
MMBtu
$115,837 $20,312 $158,000
TOTAL IMPLEMENTED $52,301 $100,027 $9,309
132,986
kWh
$992
-
kW-mo/yr
- $42,000 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs