Assessment Year | 2018 |
---|---|
Principal Product | Bread, Rolls and Crackers |
NAICS | 311821: Cookie and Cracker Manufacturing |
SIC | 2052: Cookies and Crackers |
Sales Range | $50 M to 100M |
# of Employees | 285 |
Plant Area |
285,000
ft2
|
Annual Production | 59,800,000
lb
|
Production Hrs. Annual | 6,912
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,033,834 | 19,435,200 |
kWh
|
$0.053 |
Electricity Demand | $145,561 | 33,617 |
kW-mo/yr
|
$4.33 |
Electricity Fees | $92,949 | - |
|
- |
Natural Gas | $297,908 | 74,415 |
MMBtu
|
$4.00 |
TOTAL YEARLY COSTS | $1,570,252 | |||
RECOMMENDED SAVINGS* | $359,533 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $66,360 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $293,173 | $1,270,000 |
$465,979
8,760,000
kWh
|
$51,960
-
kW-mo/yr
|
$(-119,646.0)
-
MMBtu
|
$(-105,120.0) | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $33,829 | $63,355 |
$30,435
572,147
kWh
|
$3,394
-
kW-mo/yr
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $13,104 | $23,300 | - | - |
$13,104
-
MMBtu
|
- | |
04 | 2.7141: Lower light fixtures in high ceiling areas | $11,421 | $29,224 |
$10,275
193,158
kWh
|
$1,146
-
kW-mo/yr
|
- | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,553 | $2,800 | - | - |
$5,553
-
MMBtu
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,453 | $512 |
$2,453
46,103
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $359,533 | $1,389,191 |
$509,142
9,571,408
kWh
|
$56,500
-
kW-mo/yr
|
$(-100,989.0)
-
MMBtu
|
$(-105,120.0) | ||
TOTAL IMPLEMENTED | $66,360 | $119,191 |
$43,163
811,408
kWh
|
$4,540
-
kW-mo/yr
|
$18,657
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs