ITAC Assessment: UF0508
ITAC logo
ITAC Assessment: UF0508
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Brass and Aluminum Alloys
NAICS 331524: Aluminum Foundries (except Die-Casting)
SIC 3369: Nonferrous Foundries, Except Aluminum and Copper
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 75,048
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $292,521 5,155,825
kWh
Electricity Demand $145,104 13,392
kW-mo/yr
Natural Gas $50,833 13,903
MMBtu
LPG $5,804 220
MMBtu
Waste Disposal Costs
Water Usage $6,730 1,457
Tgal
Water Disposal $9,727 1,445
Tgal
TOTAL YEARLY COSTS $510,719
RECOMMENDED SAVINGS* $74,820 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $74,820

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Water Usage Savings Water Disposal Savings
01 2.4133: Use most efficient type of electric motors $26,071 $44,637 $15,264
269,211
kWh
$10,807
-
kW-mo/yr
- - - -
02 2.2414: Use waste heat from hot flue gases to preheat $12,114 $20,000 - - $10,874
-
MMBtu
$1,240
-
MMBtu
- -
03 2.7243: Improve air circulation with destratification fans / other methods $11,931 $12,400 $8,725
153,878
kWh
$3,206
-
kW-mo/yr
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,193 $2,737 $4,529
79,872
kWh
$1,664
-
kW-mo/yr
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,144 $1,169 $6,144
107,827
kWh
- - - - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,564 - $2,204
38,865
kWh
$1,360
-
kW-mo/yr
- - - -
07 2.7311: Ventilation system to shut off when room is not in use $3,384 $640 $2,474
43,641
kWh
$910
-
kW-mo/yr
- - - -
08 2.7135: Install occupancy sensors $1,548 $478 $1,548
27,294
kWh
- - - - -
09 3.4154: Eliminate leaks in water lines and valves $3,871 $700 - - - - $1,566
-
Tgal
$2,305
-
Tgal
TOTAL RECOMMENDED $74,820 $82,761 $40,888
720,588
kWh
$17,947
-
kW-mo/yr
$10,874
-
MMBtu
$1,240
-
MMBtu
$1,566
-
Tgal
$2,305
-
Tgal
TOTAL IMPLEMENTED $74,820 $82,761 $40,888
720,588
kWh
$17,947
-
kW-mo/yr
$10,874
-
MMBtu
$1,240
-
MMBtu
$1,566
-
Tgal
$2,305
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Water Usage Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs