ITAC Assessment: UF0504
ITAC logo
ITAC Assessment: UF0504
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Brake Cables for Automobiles
NAICS 336340: Motor Vehicle Brake System Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 340
Plant Area 108,500
ft2
Annual Production 15,650,000
units
Production Hrs. Annual 5,200
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $305,279 3,473,508
kWh
TOTAL YEARLY COSTS $305,279
RECOMMENDED SAVINGS* $393,354 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Primary Product Savings
01 2.7226: Use computer programs to optimize hvac performance $12,636 $39,000 $12,636
140,400
kWh
-
02 2.7131: Add area lighting switches $2,381 $2,240 $2,381
26,460
kWh
-
03 2.2623: Minimize condenser cooling water temperature $1,236 $700 $1,236
13,728
kWh
-
04 4.122: Develop standard procedures to improve internal yields $352,554 $180,000 $1,554
17,268
kWh
$351,000
05 4.631: Install an uninteruptable power supply $15,187 $28,820 - $15,187
06 4.514: Re-arrange equipment layout to reduce handling costs $9,360 $3,600 - $9,360
TOTAL RECOMMENDED $393,354 $254,360 $17,807
197,856
kWh
$375,547
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs