ITAC Assessment: UF0502
ITAC logo
ITAC Assessment: UF0502
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Large Steel Pipes
NAICS 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area 220,000
ft2
Annual Production 305,431
ton
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,297,376 14,403,599
kWh
Natural Gas $48,392 10,425
MMBtu
Other Gas $39,026 229
MMBtu
TOTAL YEARLY COSTS $1,384,794
RECOMMENDED SAVINGS* $315,213 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Gas Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.1133: Adjust burners for efficient operation $292,994 - - $19,954
-
MMBtu
$259,233 $13,807
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,062 $2,182 $9,062
100,689
kWh
- - -
03 2.4131: Size electric motors for peak operating efficiency $7,986 - $7,986
88,733
kWh
- - -
04 2.1116: Improve combustion control capability $2,634 - - $507
-
MMBtu
- $2,127
05 2.5194: Redesign process $1,490 $1,800 $1,490
16,599
kWh
- - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,047 $57 $1,047
11,638
kWh
- - -
TOTAL RECOMMENDED $315,213 $4,039 $19,585
217,659
kWh
$20,461
-
MMBtu
$259,233 $15,934
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Gas Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs