| Assessment Year | 2017 |
|---|---|
| Principal Product | Large Steel Pipes |
| NAICS | 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
| SIC | 3317: Steel Pipe and Tubes |
| Sales Range | $10 M to 50M |
| # of Employees | 275 |
| Plant Area |
220,000
ft2
|
| Annual Production | 305,431
ton
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,297,376 | 14,403,599 |
kWh
|
$0.090 |
| Natural Gas | $48,392 | 10,425 |
MMBtu
|
$4.64 |
| Other Gas | $39,026 | 229 |
MMBtu
|
$170.07 |
| TOTAL YEARLY COSTS | $1,384,794 | |||
| RECOMMENDED SAVINGS* | $315,213 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Gas Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.1133: Adjust burners for efficient operation | $292,994 | - | - |
$19,954
-
MMBtu
|
$259,233 | $13,807 | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,062 | $2,182 |
$9,062
100,689
kWh
|
- | - | - | |
| 03 | 2.4131: Size electric motors for peak operating efficiency | $7,986 | - |
$7,986
88,733
kWh
|
- | - | - | |
| 04 | 2.1116: Improve combustion control capability | $2,634 | - | - |
$507
-
MMBtu
|
- | $2,127 | |
| 05 | 2.5194: Redesign process | $1,490 | $1,800 |
$1,490
16,599
kWh
|
- | - | - | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,047 | $57 |
$1,047
11,638
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $315,213 | $4,039 |
$19,585
217,659
kWh
|
$20,461
-
MMBtu
|
$259,233 | $15,934 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Gas Savings | Primary Raw Material Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs