ITAC Assessment: OD0116
ITAC logo
ITAC Assessment: OD0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Circuit Boards
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $1
M
to 5
M
# of Employees 34
Plant Area 16,000
ft2
Annual Production 0
units
Production Hrs. Annual 3,640
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $20,174 425,850
kWh
Electricity Demand $10,923 1,976
kW-mo/yr
Electricity Fees $5,722 -
Natural Gas $4,242 541
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,182 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,196

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,986 $1,615 $3,737
78,839
kWh
$1,191
-
kW-mo/yr
$(-1,942.0)
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $925 $2,175 $636
13,482
kWh
$289
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $921 $800 $921
19,343
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $95 $91 $62
1,172
kWh
$33
-
kW-mo/yr
-
05 2.4314: Use synthetic lubricant $255 $255 $184
3,810
kWh
$71
-
kW-mo/yr
-
TOTAL RECOMMENDED $5,182 $4,936 $5,540
116,646
kWh
$1,584
-
kW-mo/yr
$(-1,942.0)
-
MMBtu
TOTAL IMPLEMENTED $2,196 $3,321 $1,803
37,807
kWh
$393
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs