ITAC Assessment: UF0447
ITAC logo
ITAC Assessment: UF0447
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product cat litter
NAICS 327992: Ground or Treated Mineral and Earth Manufacturing
SIC 3295: Minerals and Earths, Ground or Otherwise Treated
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 1,225,391
ft2
Annual Production 100,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $457,435 5,912,100
kWh
Electricity Demand $80,596 12,537
kW-mo/yr
Natural Gas $309,002 194,482
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $98,768 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $12,701 $6,982 - - $12,701
-
MMBtu
02 2.7491: Insulate glazing, walls, ceilings, and roofs $455 $985 - - $455
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $23,292 $12,615 $19,705
252,626
kWh
$3,587
-
kW-mo/yr
-
04 2.7134: Use photocell controls $439 $147 $439
5,634
kWh
- -
05 2.7135: Install occupancy sensors $125 $120 $125
1,594
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $18,042 - $18,042
196,675
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,286 $680 $19,753
256,532
kWh
$4,533
-
kW-mo/yr
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,428 $19,015 $15,801
205,209
kWh
$3,627
-
kW-mo/yr
-
TOTAL RECOMMENDED $98,768 $40,544 $73,865
918,270
kWh
$11,747
-
kW-mo/yr
$13,156
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs