| Assessment Year | 2011 |
|---|---|
| Principal Product | citrus oil |
| NAICS | 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing |
| SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 40 |
| Plant Area |
40,000
ft2
|
| Annual Production | 20,000,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $121,959 | 1,666,240 |
kWh
|
$0.073 |
| Electricity Demand | $43,927 | 3,587 |
kW-mo/yr
|
$12.25 |
| LPG | $213,226 | 11,113 |
MMBtu
|
$19.19 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $221,521 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $50,139 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,864 | $4,542 |
$11,304
152,753
kWh
|
$2,561
-
kW-mo/yr
|
- | - | |
| 02 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $5,543 | $9,823 |
$3,071
41,496
kWh
|
$2,472
-
kW-mo/yr
|
- | - | |
| 03 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $1,693 | $939 |
$1,693
17,064
kWh
|
- | - | - | |
| 04 | 2.2622: Replace existing chiller with high efficiency model | $25,323 | $75,000 |
$25,323
253,225
kWh
|
- | - | - | |
| 05 | 2.2136: Install / repair insulation on steam lines | $43,678 | $2,580 | - | - |
$43,678
-
MMBtu
|
- | |
| 06 | 2.4323: Use optimum size and capacity equipment | $2,582 | $2,580 |
$2,582
25,815
kWh
|
- | - | - | |
| 07 | 2.4113: Install motor voltage controller on lightly loaded motors | $802 | $1,378 |
$802
8,028
kWh
|
- | - | - | |
| 08 | 2.4133: Use most efficient type of electric motors | $735 | $1,280 |
$735
9,802
kWh
|
- | - | - | |
| 09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,370 | $8,778 |
$8,370
88,102
kWh
|
- | - | - | |
| 10 | 2.1336: Install equipment to utilize waste fuel | $118,931 | $150,000 | - | - | - |
$118,931
-
lb
|
|
| TOTAL RECOMMENDED | $221,521 | $256,900 |
$53,879
596,285
kWh
|
$5,033
-
kW-mo/yr
|
$43,678
-
MMBtu
|
$118,931
-
lb
|
||
| TOTAL IMPLEMENTED | $50,139 | $90,900 |
$47,579
519,895
kWh
|
$2,561
-
kW-mo/yr
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs