Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Wafer-fabrication equipment
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range greater than $500
M
# of Employees 1,000
Plant Area 226,377
ft2
Annual Production 100
units
Production Hrs. Annual 8,568
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,420 1,471,200
kWh
Electricity Demand $30,795 2,520
kW-mo/yr
Electricity Fees $11,224 -
Natural Gas $6,931 624
MMBtu
TOTAL YEARLY COSTS $139,370
RECOMMENDED SAVINGS* $13,912 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 4.662: Level one – add communication using iiot devices to existing control system to modify operations $3,018 $7,000 - - $3,018
-
MMBtu
02 2.7496: Install partitions to reduce size of conditioned space $9,780 $12,978 $7,650
124,472
kWh
$2,130
-
kW-mo/yr
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,114 - $808
13,147
kWh
$306
-
kW-mo/yr
-
TOTAL RECOMMENDED $13,912 $19,978 $8,458
137,619
kWh
$2,436
-
kW-mo/yr
$3,018
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs