ITAC Assessment: UF0411
ITAC logo
ITAC Assessment: UF0411
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Aluminun A/C Distributors
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 211
Plant Area 236,600
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $499,011 4,588,800
kWh
Electricity Demand $64,678 902
kW-mo/yr
Electricity Fees $49,622 -
LPG $343,512 18,379
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $344,333 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $204,871

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.4133: Use most efficient type of electric motors $1,719 $4,557 $1,418
11,620
kWh
$301
-
kW-mo/yr
-
02 2.7243: Improve air circulation with destratification fans / other methods $47,620 $6,301 $43,680
233,381
kWh
$3,940
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $36,287 $40,292 $31,874
261,290
kWh
$4,413
-
kW-mo/yr
-
04 2.7141: Lower light fixtures in high ceiling areas $3,258 $461 $2,863
23,460
kWh
$395
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $1,200 $215 $1,200
9,850
kWh
- -
06 2.2437: Recover waste heat from equipment $888 $364 - - $888
-
MMBtu
07 2.2437: Recover waste heat from equipment $62,348 $20,000 - - $62,348
-
MMBtu
08 2.2437: Recover waste heat from equipment $1,520 $1,000 - - $1,520
-
MMBtu
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $53,144 $426 $53,144
390,763
kWh
- -
10 2.7226: Use computer programs to optimize hvac performance $10,946 $25,280 $10,946
89,725
kWh
- -
11 4.426: Modify workload $8,002 - $8,002
65,590
kWh
- -
12 2.2437: Recover waste heat from equipment $6,419 $3,400 - - $6,419
-
MMBtu
13 2.4322: Use or replace with energy efficient substitutes $110,982 - - - $110,982
-
MMBtu
TOTAL RECOMMENDED $344,333 $102,296 $153,127
1,085,679
kWh
$9,049
-
kW-mo/yr
$182,157
-
MMBtu
TOTAL IMPLEMENTED $204,871 $41,394 $89,081
685,363
kWh
$4,808
-
kW-mo/yr
$110,982
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs