ITAC Assessment: UF0408
ITAC logo
ITAC Assessment: UF0408
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Coated Papers
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 78,580
ft2
Annual Production 11,000
ton
Production Hrs. Annual 4,368
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,351 2,357,159
kWh
Electricity Demand $16,219 5,709
kW-mo/yr
Electricity Fees $69,479 -
Other Gas $10,799 0
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,019 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,674

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,980 $15,208 $7,196
99,984
kWh
$784
-
kW-mo/yr
- -
02 2.7111: Reduce illumination to minimum necessary levels $2,404 $870 $2,404
33,386
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $29,339 $1,246 $29,339
371,376
kWh
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $187 - $187
220
kWh
- - -
05 2.1121: Use insulation in furnaces to facilitate heating / cooling $1,753 $1,551 $1,753
22,195
kWh
- - -
06 4.111: Add equipment/ operators to reduce production bottleneck $44,425 $3,443 - - - $44,425
07 3.5217: Reuse / recycle/ sell paper products $2,931 - - - $2,931 -
TOTAL RECOMMENDED $89,019 $22,318 $40,879
527,161
kWh
$784
-
kW-mo/yr
$2,931 $44,425
TOTAL IMPLEMENTED $34,674 $2,116 $31,743
404,762
kWh
- $2,931 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs