ITAC Assessment: LE0508
ITAC logo
ITAC Assessment: LE0508
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Meat Processing
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $100
M
to 500
M
# of Employees 75
Plant Area 54,000
ft2
Annual Production 70,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $433,316 4,818,058
kWh
Electricity Demand $69,851 10,253
kW-mo/yr
Electricity Fees $79,041 -
Natural Gas $57,669 9,317
MMBtu
TOTAL YEARLY COSTS $639,877
RECOMMENDED SAVINGS* $40,179 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,470

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,328 $100 $2,151
23,901
kWh
$177
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $23,709 $29,000 $20,590
228,773
kWh
$3,119
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,110 $10,000 $6,177
68,632
kWh
$933
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,625 $3,000 $869
9,656
kWh
$756
-
kW-mo/yr
05 2.7232: Replace existing hvac unit with high efficiency model $5,407 $24,000 $4,896
54,399
kWh
$511
-
kW-mo/yr
TOTAL RECOMMENDED $40,179 $66,100 $34,683
385,361
kWh
$5,496
-
kW-mo/yr
TOTAL IMPLEMENTED $16,470 $37,100 $14,093
156,588
kWh
$2,377
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs