ITAC Assessment: UF0401
ITAC logo
ITAC Assessment: UF0401
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Reinforced hoses and rubber seals
NAICS 326291: Rubber Product Manufacturing for Mechanical Use
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 86,000
ft2
Annual Production 8,700,000
pieces
Production Hrs. Annual 4,290
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $337,825 7,107,200
kWh
Electricity Demand $146,889 15,580
kW-mo/yr
Natural Gas $17,136 20,563
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,125 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,982

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,913 $36,935 $2,643
110,256
kWh
$5,270
-
kW-mo/yr
- - -
02 2.7145: Install skylights $6,200 $14,564 $2,992
62,578
kWh
$3,208
-
kW-mo/yr
- - -
03 2.7124: Make a practice of turning off lights when not needed $3,038 - $1,871
38,938
kWh
$1,167
-
kW-mo/yr
- - -
04 2.2136: Install / repair insulation on steam lines $1,673 $2,571 $1,673
41,913
kWh
- - - -
05 3.1181: Eliminate a by-product $3,032 $158 - - $3,032
-
MMBtu
- -
06 4.424: Improve space comfort conditioning $13,160 $26,800 $13,160
105,848
kWh
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,239 $638 $2,239
46,162
kWh
- - - -
08 4.111: Add equipment/ operators to reduce production bottleneck $5,850 $957 - - - $5,850 -
09 4.445: Install equipment to move product $32,175 $1,260 - - - $32,175 -
10 4.445: Install equipment to move product $8,845 $43,500 - - - - $8,845
TOTAL RECOMMENDED $84,125 $127,383 $24,578
405,695
kWh
$9,645
-
kW-mo/yr
$3,032
-
MMBtu
$38,025 $8,845
TOTAL IMPLEMENTED $9,982 $3,367 $5,783
127,013
kWh
$1,167
-
kW-mo/yr
$3,032
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs