ITAC Assessment: UF0393
ITAC logo
ITAC Assessment: UF0393
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Flexible Packaging Products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range n/a
# of Employees 53
Plant Area 117,000
ft2
Annual Production 43,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $180,899 3,826,074
kWh
Electricity Demand $100,294 9,591
kW-mo/yr
Natural Gas $74,076 4,869
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $116,116 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,633

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $37,010 $71,812 $29,870
622,267
kWh
$7,140
-
kW-mo/yr
-
02 2.3212: Optimize plant power factor $24,700 $17,000 $17,560
355,056
kWh
$7,140
-
kW-mo/yr
-
03 2.2414: Use waste heat from hot flue gases to preheat $3,158 $1,938 - - $3,158
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,417 $10,049 $5,062
62,869
kWh
$1,355
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $14,705 $62,192 $10,363
215,904
kWh
$4,342
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $1,990 $227 $1,990
41,458
kWh
- -
07 2.4133: Use most efficient type of electric motors $19,036 $27,664 $13,389
279,512
kWh
$5,647
-
kW-mo/yr
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,457 - $8,457
108,994
kWh
- -
09 2.6218: Turn off equipment when not in use $643 - $455
9,400
kWh
$188
-
kW-mo/yr
-
TOTAL RECOMMENDED $116,116 $190,882 $87,146
1,695,460
kWh
$25,812
-
kW-mo/yr
$3,158
-
MMBtu
TOTAL IMPLEMENTED $2,633 $227 $2,445
50,858
kWh
$188
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings