ITAC Assessment: UF0387
ITAC logo
ITAC Assessment: UF0387
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Aerospace blades/vanes
NAICS 333611: Turbine and Turbine Generator Set Units Manufacturing
SIC 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 118,000
ft2
Annual Production 240,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $792,307 10,035,284
kWh
Electricity Demand $215,381 29,149
kW-mo/yr
Natural Gas $596,546 41,239
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,355 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,285

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings
01 2.2511: Insulate bare equipment $1,545 $2,803 $1,545
19,551
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $24,561 $2,190 $24,561
310,903
kWh
- - -
03 2.6218: Turn off equipment when not in use $7,957 - $7,957
138,387
kWh
- - -
04 2.7229: Air condition only space necessary $2,639 $3,360 $2,639
45,895
kWh
- - -
05 2.7141: Lower light fixtures in high ceiling areas $4,265 $578 $3,626
63,072
kWh
$639
-
kW-mo/yr
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,577 $370 $1,098
7,842
kWh
- $352 $127
07 2.4131: Size electric motors for peak operating efficiency $21,479 - $17,222
299,520
kWh
$4,257
-
kW-mo/yr
- -
08 2.7124: Make a practice of turning off lights when not needed $2,017 - $2,017
35,076
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $13,106 $6,458 $11,088
192,842
kWh
$2,018
-
kW-mo/yr
- -
10 2.7135: Install occupancy sensors $209 $140 $209
3,635
kWh
- - -
TOTAL RECOMMENDED $79,355 $15,899 $71,962
1,116,723
kWh
$6,914
-
kW-mo/yr
$352 $127
TOTAL IMPLEMENTED $64,285 $11,821 $57,531
865,734
kWh
$6,275
-
kW-mo/yr
$352 $127
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs