| Assessment Year | 2006 |
|---|---|
| Principal Product | Fresh Pork |
| NAICS | 311611: Animal (except Poultry) Slaughtering |
| SIC | 2011: Meat Packing Plants |
| Sales Range | $1 M to 5M |
| # of Employees | 16 |
| Plant Area |
958,320
ft2
|
| Annual Production | 8,000,000
lb
|
| Production Hrs. Annual | 2,610
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $137,045 | 1,111,288 |
kWh
|
$0.12 |
| Electricity Demand | $18,161 | 2,286 |
kW-mo/yr
|
$7.94 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $47,606 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,087 | $1,070 |
$2,600
41,671
kWh
|
$487
-
kW-mo/yr
|
- | |
| 02 | 2.7135: Install occupancy sensors | $2,569 | $2,053 |
$2,569
41,168
kWh
|
- | - | |
| 03 | 2.7124: Make a practice of turning off lights when not needed | $117 | - |
$117
1,872
kWh
|
- | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,026 | - |
$8,026
101,207
kWh
|
- | - | |
| 05 | 2.4133: Use most efficient type of electric motors | $1,822 | $3,057 |
$1,449
23,387
kWh
|
$373
-
kW-mo/yr
|
- | |
| 06 | 2.2511: Insulate bare equipment | $1,524 | $408 |
$1,524
19,225
kWh
|
- | - | |
| 07 | 2.2691: Shut off cooling if cold outside air will cool process | $2,857 | $575 |
$2,857
36,025
kWh
|
- | - | |
| 08 | 2.2511: Insulate bare equipment | $25,292 | $72,945 |
$25,292
405,316
kWh
|
- | - | |
| 09 | 2.8226: Increase efficiency of trucks | $2,312 | - | - | - | $2,312 | |
| TOTAL RECOMMENDED | $47,606 | $80,108 |
$44,434
669,871
kWh
|
$860
-
kW-mo/yr
|
$2,312 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs