Assessment Year | 2006 |
---|---|
Principal Product | Fresh Pork |
NAICS | 311611: Animal (except Poultry) Slaughtering |
SIC | 2011: Meat Packing Plants |
Sales Range | $1 M to 5M |
# of Employees | 16 |
Plant Area |
958,320
ft2
|
Annual Production | 8,000,000
lb
|
Production Hrs. Annual | 2,610
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $137,045 | 1,111,288 |
kWh
|
$0.12 |
Electricity Demand | $18,161 | 2,286 |
kW-mo/yr
|
$7.94 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $47,606 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,087 | $1,070 |
$2,600
41,671
kWh
|
$487
-
kW-mo/yr
|
- | |
02 | 2.7135: Install occupancy sensors | $2,569 | $2,053 |
$2,569
41,168
kWh
|
- | - | |
03 | 2.7124: Make a practice of turning off lights when not needed | $117 | - |
$117
1,872
kWh
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,026 | - |
$8,026
101,207
kWh
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $1,822 | $3,057 |
$1,449
23,387
kWh
|
$373
-
kW-mo/yr
|
- | |
06 | 2.2511: Insulate bare equipment | $1,524 | $408 |
$1,524
19,225
kWh
|
- | - | |
07 | 2.2691: Shut off cooling if cold outside air will cool process | $2,857 | $575 |
$2,857
36,025
kWh
|
- | - | |
08 | 2.2511: Insulate bare equipment | $25,292 | $72,945 |
$25,292
405,316
kWh
|
- | - | |
09 | 2.8226: Increase efficiency of trucks | $2,312 | - | - | - | $2,312 | |
TOTAL RECOMMENDED | $47,606 | $80,108 |
$44,434
669,871
kWh
|
$860
-
kW-mo/yr
|
$2,312 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs