Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Plywood
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $100
M
to 500
M
# of Employees 170
Plant Area 784,080
ft2
Annual Production 0
units
Production Hrs. Annual 8,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $699,413 18,717,840
kWh
Electricity Demand $171,419 38,589
kW-mo/yr
Natural Gas $471,427 45,234
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,277 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,814

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7124: Make a practice of turning off lights when not needed $3,568 - $3,568
93,897
kWh
- - -
02 2.7141: Lower light fixtures in high ceiling areas $4,916 $715 $4,122
108,472
kWh
$794
-
kW-mo/yr
- -
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $3,105 $4,018 $1,981
52,117
kWh
$1,124
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,069 $5,892 $3,485
91,712
kWh
$584
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,966 $334 $2,966
63,104
kWh
- - -
06 2.4239: Eliminate or reduce compressed air usage $721 - $721
15,337
kWh
- - -
07 2.4321: Upgrade obsolete equipment $21,240 $43,000 $21,240
822,105
kWh
- - -
08 3.1181: Eliminate a by-product $278 $32 - - $278
-
MMBtu
-
09 2.6218: Turn off equipment when not in use $1,919 - $1,919
50,498
kWh
- - -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,495 $8,880 $7,944
209,082
kWh
$2,551
-
kW-mo/yr
- -
11 4.445: Install equipment to move product $29,000 $8,480 - - - $29,000
TOTAL RECOMMENDED $82,277 $71,351 $47,946
1,506,324
kWh
$5,053
-
kW-mo/yr
$278
-
MMBtu
$29,000
TOTAL IMPLEMENTED $41,814 $52,961 $38,191
1,253,261
kWh
$3,345
-
kW-mo/yr
$278
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs