Assessment Year | 2006 |
---|---|
Principal Product | Southern yellow pine lumber |
NAICS | 321113: Sawmills |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $50 M to 100M |
# of Employees | 220 |
Plant Area |
12,000
ft2
|
Annual Production | 132
units
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $715,372 | 19,166,226 |
kWh
|
$0.037 |
Electricity Demand | $174,696 | 39,572 |
kW-mo/yr
|
$4.41 |
Natural Gas | $3,608 | 252 |
MMBtu
|
$14.33 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $72,419 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $67,766 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Wood Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7124: Make a practice of turning off lights when not needed | $519 | - |
$519
13,666
kWh
|
- | - | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $1,705 | - |
$1,271
33,456
kWh
|
$434
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,948 | $8,787 |
$2,170
56,270
kWh
|
$778
-
kW-mo/yr
|
- | - | |
04 | 2.2522: Isolate hot or cold equipment | $8,414 | $1,095 | - | - | - |
$8,414
-
MMBtu
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $40,792 | $517 |
$40,792
867,914
kWh
|
- | - | - | |
06 | 2.2314: Replace heat treating oven with more efficient unit | $18,041 | $44,500 | - | - |
$18,041
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $72,419 | $54,899 |
$44,752
971,306
kWh
|
$1,212
-
kW-mo/yr
|
$18,041
-
MMBtu
|
$8,414
-
MMBtu
|
||
TOTAL IMPLEMENTED | $67,766 | $46,112 |
$41,311
881,580
kWh
|
- |
$18,041
-
MMBtu
|
$8,414
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Wood Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs