ITAC Assessment: UF0373
ITAC logo
ITAC Assessment: UF0373
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Brake Hose Assemblies
NAICS 332912: Fluid Power Valve and Hose Fitting Manufacturing
SIC 3492: Fluid Power Valves and Hose Fittings
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 135,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 6,885
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $387,315 6,480,002
kWh
Electricity Demand $77,976 1,083
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $92,177 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $78,316

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,471 $1,124 $18,471
307,853
kWh
- -
02 2.6218: Turn off equipment when not in use $1,366 - $1,366
30,354
kWh
- -
03 2.7135: Install occupancy sensors $13,109 $1,327 $13,109
218,478
kWh
- -
04 2.4133: Use most efficient type of electric motors $1,178 $1,272 $1,178
18,875
kWh
- -
05 2.7292: Lower ceiling to reduce conditioned space $15,306 $1,300 $15,306
340,128
kWh
- -
06 2.7229: Air condition only space necessary $13,549 $36,650 $13,549
225,821
kWh
- -
07 3.5318: Recycle fluorescent lamps $312 $3,496 - - $312
08 4.111: Add equipment/ operators to reduce production bottleneck $2,448 $954 - - $2,448
09 4.424: Improve space comfort conditioning $26,438 $1,500 - $26,438 -
TOTAL RECOMMENDED $92,177 $47,623 $62,979
1,141,509
kWh
$26,438 $2,760
TOTAL IMPLEMENTED $78,316 $7,477 $49,430
915,688
kWh
$26,438 $2,448
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs