Assessment Year | 2005 |
---|---|
Principal Product | Brake Hose Assemblies |
NAICS | 332912: Fluid Power Valve and Hose Fitting Manufacturing |
SIC | 3492: Fluid Power Valves and Hose Fittings |
Sales Range | $10 M to 50M |
# of Employees | 220 |
Plant Area |
135,000
ft2
|
Annual Production | 3,000,000
pieces
|
Production Hrs. Annual | 6,885
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $387,315 | 6,480,002 |
kWh
|
$0.060 |
Electricity Demand | $77,976 | 1,083 |
kW-mo/yr
|
$72.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $92,177 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $78,316 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,471 | $1,124 |
$18,471
307,853
kWh
|
- | - | |
02 | 2.6218: Turn off equipment when not in use | $1,366 | - |
$1,366
30,354
kWh
|
- | - | |
03 | 2.7135: Install occupancy sensors | $13,109 | $1,327 |
$13,109
218,478
kWh
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $1,178 | $1,272 |
$1,178
18,875
kWh
|
- | - | |
05 | 2.7292: Lower ceiling to reduce conditioned space | $15,306 | $1,300 |
$15,306
340,128
kWh
|
- | - | |
06 | 2.7229: Air condition only space necessary | $13,549 | $36,650 |
$13,549
225,821
kWh
|
- | - | |
07 | 3.5318: Recycle fluorescent lamps | $312 | $3,496 | - | - | $312 | |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $2,448 | $954 | - | - | $2,448 | |
09 | 4.424: Improve space comfort conditioning | $26,438 | $1,500 | - | $26,438 | - | |
TOTAL RECOMMENDED | $92,177 | $47,623 |
$62,979
1,141,509
kWh
|
$26,438 | $2,760 | ||
TOTAL IMPLEMENTED | $78,316 | $7,477 |
$49,430
915,688
kWh
|
$26,438 | $2,448 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs