ITAC Assessment: UF0363
ITAC logo
ITAC Assessment: UF0363
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Sheet Metal Products
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 858,000
ft2
Annual Production 40,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,488 3,178,920
kWh
Electricity Demand $39,934 6,790
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $958,846 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $932,161

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Product Savings
01 2.7145: Install skylights $13,867 $51,456 $7,217
232,793
kWh
$6,650
-
kW-mo/yr
-
02 2.7226: Use computer programs to optimize hvac performance $12,819 $20,000 $11,227
362,154
kWh
$1,592
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,583 $934 $9,583
217,804
kWh
- -
04 2.7134: Use photocell controls $6,875 $2,070 $3,055
98,542
kWh
$3,820
-
kW-mo/yr
-
05 2.6218: Turn off equipment when not in use $4,898 - $4,898
157,985
kWh
- -
06 2.7229: Air condition only space necessary $3,044 $6,525 $3,044
98,178
kWh
- -
07 2.4133: Use most efficient type of electric motors $1,902 $5,156 $915
29,522
kWh
$987
-
kW-mo/yr
-
08 2.7135: Install occupancy sensors $1,382 $1,026 $1,382
44,593
kWh
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $630 $1,935 $630
20,318
kWh
- -
10 4.651: Install back-up equipment $903,847 $67,712 - - $903,847
TOTAL RECOMMENDED $958,846 $156,814 $41,950
1,261,889
kWh
$13,049
-
kW-mo/yr
$903,847
TOTAL IMPLEMENTED $932,161 $85,358 $23,507
666,942
kWh
$4,807
-
kW-mo/yr
$903,847
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs