Assessment Year | 2001 |
---|---|
Principal Product | Lithographic printing |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
65,000
ft2
|
Annual Production | 2,700
ton
|
Production Hrs. Annual | 4,878
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $147,144 | 3,415,478 |
kWh
|
$0.043 |
Electricity Demand | $58,775 | 9,374 |
kW-mo/yr
|
$6.27 |
Natural Gas | $222 | 3 |
MMBtu
|
$74.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,440 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $11,290 | $15,750 | - |
$11,290
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,370 | $870 |
$240
5,330
kWh
|
$90
-
kW-mo/yr
|
$2,040 | |
03 | 2.7124: Make a practice of turning off lights when not needed | $1,450 | - |
$840
18,600
kWh
|
$610
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,370 | $200 |
$1,370
30,400
kWh
|
- | - | |
05 | 2.8123: Pay utility bills on time | $1,230 | - | - | - | $1,230 | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $810 | $75 |
$490
11,000
kWh
|
$320
-
kW-mo/yr
|
- | |
07 | 2.7124: Make a practice of turning off lights when not needed | $500 | - |
$500
11,140
kWh
|
- | - | |
08 | 2.7124: Make a practice of turning off lights when not needed | $420 | - |
$420
9,400
kWh
|
- | - | |
TOTAL RECOMMENDED | $19,440 | $16,895 |
$3,860
85,870
kWh
|
$12,310
-
kW-mo/yr
|
$3,270 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs