Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Automobile Electronic Parts
NAICS 334419: Other Electronic Component Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range n/a
# of Employees 425
Plant Area 73,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 6,864
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $791,929 10,745,952
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,913 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,339

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $16,815 $9 $16,815
227,223
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,264 $1 $11,264
152,218
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,324 $2 $4,324
58,434
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,002 $2 $2,002
27,054
kWh
-
05 2.6218: Turn off equipment when not in use $1,934 - $1,934
26,136
kWh
-
06 3.5318: Recycle fluorescent lamps $574 $3 - $574
-
lb
TOTAL RECOMMENDED $36,913 $17 $36,339
491,065
kWh
$574
-
lb
TOTAL IMPLEMENTED $36,339 $14 $36,339
491,065
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs