ITAC Assessment: UF0351
ITAC logo
ITAC Assessment: UF0351
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Titanium and Zirconium
NAICS 331491: Nonferrous Metal (except Copper and Aluminum) Rolling, Drawing, and Extruding
SIC 3356: Rolling, Drawing, and Extruding of Nonferrous Metals, Except Copper and Aluminum
Sales Range $10
M
to 50
M
# of Employees 102
Plant Area 87,120
ft2
Annual Production 190,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,312,412 53,241,209
kWh
Natural Gas $22,084 18,669
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $292,078 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,329

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7124: Make a practice of turning off lights when not needed $3,410 $1,004 $2,782
64,696
kWh
$628
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,704 $5,952 $7,233
168,199
kWh
$471
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $22,503 - $22,503
523,330
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,480 $3,600 $1,480
-
kWh
- - -
05 2.4133: Use most efficient type of electric motors $14,215 $35,243 $13,342
310,285
kWh
$873
-
kW-mo/yr
- -
06 2.1213: Direct warmest air to combustion intake $16,846 $85,000 - - $16,846
-
MMBtu
-
07 3.5242: Recover metals from spent solutions and recycle $225,920 $200,000 - - - $225,920
-
lb
TOTAL RECOMMENDED $292,078 $330,799 $47,340
1,066,510
kWh
$1,972
-
kW-mo/yr
$16,846
-
MMBtu
$225,920
-
lb
TOTAL IMPLEMENTED $25,329 $42,199 $23,357
543,180
kWh
$1,972
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs