ITAC Assessment: UF0350
ITAC logo
ITAC Assessment: UF0350
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Manufacture Fibres
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 47
Plant Area 490,000
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 4,368
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $770,725 18,228,204
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,506 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,478

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings
01 2.3512: De-energize excess transformer capacity $22,657 $60,000 $22,657
539,448
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,654 $10,151 $6,654
158,422
kWh
- - -
03 2.7135: Install occupancy sensors $17,652 $1,339 $17,652
420,292
kWh
- - -
04 2.7145: Install skylights $12,961 $9,706 $12,961
308,599
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,068 $1,610 $5,068
120,675
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $563 $1,750 $563
13,403
kWh
- - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,988 - $8,988
213,991
kWh
- - -
08 3.5318: Recycle fluorescent lamps $1,968 $3,496 - - $1,968
-
lb
-
09 3.1191: Change procedures / equipment / operating conditions $4,200 - - $4,200
-
lb
- -
10 4.611: Begin a practice of predictive / preventative maintenance $1,795 $3,000 - - - $1,795
TOTAL RECOMMENDED $82,506 $91,052 $74,543
1,774,830
kWh
$4,200
-
lb
$1,968
-
lb
$1,795
TOTAL IMPLEMENTED $26,478 $24,467 $24,683
587,696
kWh
- - $1,795
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs