| Assessment Year | 2004 |
|---|---|
| Principal Product | Manufacture Fibres |
| NAICS | 325211: Plastics Material and Resin Manufacturing |
| SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
| Sales Range | $10 M to 50M |
| # of Employees | 47 |
| Plant Area |
490,000
ft2
|
| Annual Production | 12,000,000
lb
|
| Production Hrs. Annual | 4,368
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $770,725 | 18,228,204 |
kWh
|
$0.042 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $82,506 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $26,478 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.3512: De-energize excess transformer capacity | $22,657 | $60,000 |
$22,657
539,448
kWh
|
- | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,654 | $10,151 |
$6,654
158,422
kWh
|
- | - | - | |
| 03 | 2.7135: Install occupancy sensors | $17,652 | $1,339 |
$17,652
420,292
kWh
|
- | - | - | |
| 04 | 2.7145: Install skylights | $12,961 | $9,706 |
$12,961
308,599
kWh
|
- | - | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,068 | $1,610 |
$5,068
120,675
kWh
|
- | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $563 | $1,750 |
$563
13,403
kWh
|
- | - | - | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $8,988 | - |
$8,988
213,991
kWh
|
- | - | - | |
| 08 | 3.5318: Recycle fluorescent lamps | $1,968 | $3,496 | - | - |
$1,968
-
lb
|
- | |
| 09 | 3.1191: Change procedures / equipment / operating conditions | $4,200 | - | - |
$4,200
-
lb
|
- | - | |
| 10 | 4.611: Begin a practice of predictive / preventative maintenance | $1,795 | $3,000 | - | - | - | $1,795 | |
| TOTAL RECOMMENDED | $82,506 | $91,052 |
$74,543
1,774,830
kWh
|
$4,200
-
lb
|
$1,968
-
lb
|
$1,795 | ||
| TOTAL IMPLEMENTED | $26,478 | $24,467 |
$24,683
587,696
kWh
|
- | - | $1,795 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs