ITAC Assessment: UF0340
ITAC logo
ITAC Assessment: UF0340
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Processed Meat
NAICS 311611: Animal (except Poultry) Slaughtering
SIC 2011: Meat Packing Plants
Sales Range $100
M
to 500
M
# of Employees 700
Plant Area 250,000
ft2
Annual Production 144,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,588,672 31,439,730
kWh
Electricity Demand $439,998 60,047
kW-mo/yr
Natural Gas $1,333,303 195,385
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $839,377 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,430

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.2414: Use waste heat from hot flue gases to preheat $122,549 $170,000 - - $122,549
-
MMBtu
- -
02 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $617,545 $2,420,000 $842,186
12,480,000
kWh
$166,549
-
kW-mo/yr
$(-355,190.0)
-
MMBtu
$(-36,000.0) -
03 3.4141: Replace the chlorination stage with an oxygen or ozone stage $29,744 $98,000 - - - $(-5,256.0) $35,000
04 2.7142: Utilize higher efficiency lamps and/or ballasts $38,590 $48,289 $32,778
595,956
kWh
$5,812
-
kW-mo/yr
- - -
05 2.3212: Optimize plant power factor $10,480 $40,000 - - - $10,480 -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,682 $400 $7,658
109,402
kWh
- - $24 -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,109 $37,572 $7,109
101,556
kWh
- - - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,678 $7,900 $5,678
81,120
kWh
- - - -
TOTAL RECOMMENDED $839,377 $2,822,161 $895,409
13,368,034
kWh
$172,361
-
kW-mo/yr
$(-232,641.0)
-
MMBtu
$(-30,752.0) $35,000
TOTAL IMPLEMENTED $62,430 $96,589 $46,114
786,478
kWh
$5,812
-
kW-mo/yr
- $10,504 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs