Assessment Year | 2004 |
---|---|
Principal Product | Processed Meat |
NAICS | 311611: Animal (except Poultry) Slaughtering |
SIC | 2011: Meat Packing Plants |
Sales Range | $100 M to 500M |
# of Employees | 700 |
Plant Area |
250,000
ft2
|
Annual Production | 144,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,588,672 | 31,439,730 |
kWh
|
$0.051 |
Electricity Demand | $439,998 | 60,047 |
kW-mo/yr
|
$7.33 |
Natural Gas | $1,333,303 | 195,385 |
MMBtu
|
$6.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $839,377 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $62,430 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $122,549 | $170,000 | - | - |
$122,549
-
MMBtu
|
- | - | |
02 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $617,545 | $2,420,000 |
$842,186
12,480,000
kWh
|
$166,549
-
kW-mo/yr
|
$(-355,190.0)
-
MMBtu
|
$(-36,000.0) | - | |
03 | 3.4141: Replace the chlorination stage with an oxygen or ozone stage | $29,744 | $98,000 | - | - | - | $(-5,256.0) | $35,000 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $38,590 | $48,289 |
$32,778
595,956
kWh
|
$5,812
-
kW-mo/yr
|
- | - | - | |
05 | 2.3212: Optimize plant power factor | $10,480 | $40,000 | - | - | - | $10,480 | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,682 | $400 |
$7,658
109,402
kWh
|
- | - | $24 | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,109 | $37,572 |
$7,109
101,556
kWh
|
- | - | - | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,678 | $7,900 |
$5,678
81,120
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $839,377 | $2,822,161 |
$895,409
13,368,034
kWh
|
$172,361
-
kW-mo/yr
|
$(-232,641.0)
-
MMBtu
|
$(-30,752.0) | $35,000 | ||
TOTAL IMPLEMENTED | $62,430 | $96,589 |
$46,114
786,478
kWh
|
$5,812
-
kW-mo/yr
|
- | $10,504 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs