ITAC Assessment: UF0335
ITAC logo
ITAC Assessment: UF0335
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Corrugated Boxes
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range n/a
# of Employees 100
Plant Area 250,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 6,600
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $359,191 6,503,093
kWh
Electricity Demand $107,186 14,098
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $92,308 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,475

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7131: Add area lighting switches $2,525 $10,670 $2,525
35,070
kWh
- -
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $44,300 $205,000 $44,300
649,440
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $26,089 $41,729 $20,891
379,842
kWh
$5,198
-
kW-mo/yr
-
04 2.4133: Use most efficient type of electric motors $7,790 $13,573 $7,630
138,727
kWh
$160
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $4,008 - $4,008
55,670
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,359 $376 $4,359
60,801
kWh
- -
07 2.3212: Optimize plant power factor $3,237 $20,000 - - $3,237
TOTAL RECOMMENDED $92,308 $291,348 $83,713
1,319,550
kWh
$5,358
-
kW-mo/yr
$3,237
TOTAL IMPLEMENTED $41,475 $75,678 $32,880
579,370
kWh
$5,358
-
kW-mo/yr
$3,237
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs