Assessment Year | 2003 |
---|---|
Principal Product | Corrugated Boxes |
NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | n/a |
# of Employees | 100 |
Plant Area |
250,000
ft2
|
Annual Production | 0
pieces
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $359,191 | 6,503,093 |
kWh
|
$0.055 |
Electricity Demand | $107,186 | 14,098 |
kW-mo/yr
|
$7.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $92,308 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $41,475 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7131: Add area lighting switches | $2,525 | $10,670 |
$2,525
35,070
kWh
|
- | - | |
02 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $44,300 | $205,000 |
$44,300
649,440
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $26,089 | $41,729 |
$20,891
379,842
kWh
|
$5,198
-
kW-mo/yr
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $7,790 | $13,573 |
$7,630
138,727
kWh
|
$160
-
kW-mo/yr
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,008 | - |
$4,008
55,670
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,359 | $376 |
$4,359
60,801
kWh
|
- | - | |
07 | 2.3212: Optimize plant power factor | $3,237 | $20,000 | - | - | $3,237 | |
TOTAL RECOMMENDED | $92,308 | $291,348 |
$83,713
1,319,550
kWh
|
$5,358
-
kW-mo/yr
|
$3,237 | ||
TOTAL IMPLEMENTED | $41,475 | $75,678 |
$32,880
579,370
kWh
|
$5,358
-
kW-mo/yr
|
$3,237 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs