ITAC Assessment: UF0334
ITAC logo
ITAC Assessment: UF0334
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Rubber Hoses
NAICS 326220: Rubber and Plastics Hoses and Belting Manufacturing
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $50
M
to 100
M
# of Employees 550
Plant Area 424,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,160
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,737 415,987
kWh
Natural Gas $14,297 280,325
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $161,951 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $161,951

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $19,397 $57,060 $14,297
280,325
kWh
$5,100
-
kW-mo/yr
- - -
02 2.7132: Install timers on light switches in little used areas $1,095 $2,128 $1,095
16,589
kWh
- - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $13,612 - $10,775
211,283
kWh
- - $1,131 $1,706
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,681 $376 $11,700
177,276
kWh
- - $(-19.0) -
05 3.1294: Segregate spent solvents and reuse in subsequent washings $33,833 $43,600 - - $33,833
-
gal
- -
06 4.652: Replace existing equipment with more suitable substitutes $82,333 $168,000 - - - $82,333 -
TOTAL RECOMMENDED $161,951 $271,164 $37,867
685,473
kWh
$5,100
-
kW-mo/yr
$33,833
-
gal
$83,445 $1,706
TOTAL IMPLEMENTED $161,951 $271,164 $37,867
685,473
kWh
$5,100
-
kW-mo/yr
$33,833
-
gal
$83,445 $1,706
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs