ITAC Assessment: UF0330
ITAC logo
ITAC Assessment: UF0330
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Fiberglass Boats
NAICS 336612: Boat Building
SIC 3732: Boat Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 200,000
ft2
Annual Production 2,028
pieces
Production Hrs. Annual 4,030
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $181,150 2,173,800
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $188,742 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,174

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,935 - $2,935
34,533
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,321 - $3,321
25,591
kWh
-
03 2.4238: Do not use compressed air for personal cooling $1,174 - $1,174
13,813
kWh
-
04 4.448: Install automatic part storage / retreval system $4,992 $974 - $4,992
05 4.445: Install equipment to move product $43,330 $23,017 - $43,330
06 4.446: Automate finishing process $132,990 $300,000 - $132,990
TOTAL RECOMMENDED $188,742 $323,991 $7,430
73,937
kWh
$181,312
TOTAL IMPLEMENTED $1,174 - $1,174
13,813
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs