ITAC Assessment: UF0319
ITAC logo
ITAC Assessment: UF0319
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Chemicals
NAICS 311942: Spice and Extract Manufacturing
SIC 2087: Flavoring Extracts and Flavoring Syrups, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 8,712,035
ft2
Annual Production 450,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $859,168 24,870,204
kWh
Natural Gas $2,663,654 644,549
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $91,407 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,276

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,379 $9,534 $2,379
64,300
kWh
- -
02 2.2511: Insulate bare equipment $1,277 $825 - $1,277
-
MMBtu
-
03 2.3212: Optimize plant power factor $3,600 $20,000 - - $3,600
04 2.7111: Reduce illumination to minimum necessary levels $6,151 $17,945 $6,151
166,234
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $12,620 - $12,620
341,089
kWh
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,140 $52,700 $12,140
328,104
kWh
- -
07 2.2152: Maintain steam jets used for vacuum system $53,240 $38,924 - $53,240
-
MMBtu
-
TOTAL RECOMMENDED $91,407 $139,928 $33,290
899,727
kWh
$54,517
-
MMBtu
$3,600
TOTAL IMPLEMENTED $16,276 $10,359 $14,999
405,389
kWh
$1,277
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings