Assessment Year | 2003 |
---|---|
Principal Product | Chemicals |
NAICS | 311942: Spice and Extract Manufacturing |
SIC | 2087: Flavoring Extracts and Flavoring Syrups, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 45 |
Plant Area |
8,712,035
ft2
|
Annual Production | 450,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $859,168 | 24,870,204 |
kWh
|
$0.035 |
Natural Gas | $2,663,654 | 644,549 |
MMBtu
|
$4.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $91,407 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,276 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,379 | $9,534 |
$2,379
64,300
kWh
|
- | - | |
02 | 2.2511: Insulate bare equipment | $1,277 | $825 | - |
$1,277
-
MMBtu
|
- | |
03 | 2.3212: Optimize plant power factor | $3,600 | $20,000 | - | - | $3,600 | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $6,151 | $17,945 |
$6,151
166,234
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $12,620 | - |
$12,620
341,089
kWh
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,140 | $52,700 |
$12,140
328,104
kWh
|
- | - | |
07 | 2.2152: Maintain steam jets used for vacuum system | $53,240 | $38,924 | - |
$53,240
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $91,407 | $139,928 |
$33,290
899,727
kWh
|
$54,517
-
MMBtu
|
$3,600 | ||
TOTAL IMPLEMENTED | $16,276 | $10,359 |
$14,999
405,389
kWh
|
$1,277
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs