ITAC Assessment: UD0476
ITAC logo
ITAC Assessment: UD0476
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product embroidered and screen printed sportswear
NAICS
n/a
SIC 2396: Automotive Trimmings, Apparel Findings, and Related Products
Sales Range $10
M
to 50
M
# of Employees 260
Plant Area 290,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 4,900
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,759 2,953,986
kWh
Natural Gas $30,799 5,517
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,943 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,943

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,900 $1,000 $4,000
-
kWh
$(-1,100.0)
-
MMBtu
-
02 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,648 $12,000 - - $3,648
03 2.7142: Utilize higher efficiency lamps and/or ballasts $10,234 $15,045 $10,234
121,336
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,633 $10,570 $4,633
52,169
kWh
- -
05 2.7122: Disconnect ballasts $2,576 $1,920 $2,668
29,894
kWh
$(-284.0)
-
MMBtu
$192
06 2.7142: Utilize higher efficiency lamps and/or ballasts $6,376 $7,760 $6,376
71,805
kWh
- -
07 2.7122: Disconnect ballasts $673 $210 $555
11,137
kWh
- $118
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,903 $3,290 $3,903
78,546
kWh
- -
TOTAL RECOMMENDED $34,943 $51,795 $32,369
364,887
kWh
$(-1,384.0)
-
MMBtu
$3,958
TOTAL IMPLEMENTED $34,943 $51,795 $32,369
364,887
kWh
$(-1,384.0)
-
MMBtu
$3,958
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs