ITAC Assessment: UF0313
ITAC logo
ITAC Assessment: UF0313
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Roof shingles
NAICS 324122: Asphalt Shingle and Coating Materials Manufacturing
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 250,000
ft2
Annual Production 3,200,000
pieces
Production Hrs. Annual 7,800
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $379,031 8,064,988
kWh
Electricity Demand $23,085 15,516
kW-mo/yr
Natural Gas $423,782 103,677
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $506,135 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $81,290

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,514 $1,631 $12,014
235,562
kWh
$500
-
kW-mo/yr
- - - - -
02 2.4133: Use most efficient type of electric motors $1,785 $1,826 $1,713
33,580
kWh
$72
-
kW-mo/yr
- - - - -
03 2.2414: Use waste heat from hot flue gases to preheat $58,093 $31,024 - - $58,093
-
MMBtu
- - - -
04 2.3212: Optimize plant power factor $13,902 $27,000 - - - - - $13,902 -
05 2.2511: Insulate bare equipment $7,223 $973 - - $7,223
-
MMBtu
- - - -
06 2.2424: Use heat in flue gases to preheat products or materials $19,080 $34,976 - - $19,080
-
MMBtu
- - - -
07 3.6192: Use a less expensive method of waste removal $333,770 $250,000 $(-18,857.0)
(-369,750)
kWh
$(-3,648.0)
-
kW-mo/yr
- $356,275
-
lb
- - -
08 4.651: Install back-up equipment $57,960 $109,500 - - - - - - $57,960
09 4.444: Install system to collect scrap $1,808 $700 - - - - $1,808 - -
TOTAL RECOMMENDED $506,135 $457,630 $(-5,130.0)
(-100,608)
kWh
$(-3,076.0)
-
kW-mo/yr
$84,396
-
MMBtu
$356,275
-
lb
$1,808 $13,902 $57,960
TOTAL IMPLEMENTED $81,290 $114,630 $13,727
269,142
kWh
$572
-
kW-mo/yr
$7,223
-
MMBtu
- $1,808 - $57,960
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs